{"id":32402,"date":"2026-06-01T12:01:08","date_gmt":"2026-06-01T15:01:08","guid":{"rendered":"https:\/\/lefosse.com\/?p=32402"},"modified":"2026-06-01T12:01:39","modified_gmt":"2026-06-01T15:01:39","slug":"newsletter-shipping-may-2026","status":"publish","type":"post","link":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/","title":{"rendered":"Newsletter | Shipping &#8211; May, 2026"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><em>This edition covers April and May.<\/em><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#6100b9\" class=\"has-inline-color\">Featured News<\/mark><\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">ANTAQ extends deadline for Public Hearing No. 2\/2026 on the Port of Santos access channel<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On April 22, 2026, the National Waterway Transportation Agency (&#8220;<strong>ANTAQ<\/strong>&#8220;) published <a href=\"https:\/\/www.in.gov.br\/web\/dou\/-\/deliberacao-dg-n-21\/antaq-de-17-de-abril-de-2026-700560589\">DG Deliberation No. 21\/2026<\/a>, which extended the deadline for submission of contributions to P<a href=\"https:\/\/leilao.antaq.gov.br\/default.aspx?audiencia=179\">ublic Hearing No. 2\/2026<\/a>, concerning the technical and legal documents for the concession of the Waterway Access Channel of the Organized Port of Santos\/SP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The concession, with an estimated value of R$ 23.45 billion, will have a 25-year term from the Assumption Date, with successive extensions permitted up to a maximum limit of 70 years, according to the documents submitted for public participation. For further information, click <a href=\"https:\/\/nam10.safelinks.protection.outlook.com\/?url=https%3A%2F%2Flefosse.com%2Fnoticias%2Falerta%2Fconcessao-do-canal-de-acesso-ao-porto-de-santos-e-outras-consultas-publicas-em-andamento-no-setor-portuario%2F&amp;data=05%7C02%7Cgustavo.almeida%40lefosse.com%7C25c2bc66d38b4bf0f2a808dead38cc31%7C8327b217ef5441a599c8c8fdfaeb06cb%7C0%7C0%7C639138656632046485%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&amp;sdata=kXEUjWxYcD4o95JFhN71xGTjUnFayRHbw4fuHD802jY%3D&amp;reserved=0\">here<\/a> to access the Alert on the matter prepared by our Maritime Law team.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Deadline: from March 17, 2026 to July 1, 2026, through <a href=\"https:\/\/www.gov.br\/antaq\/pt-br\/acesso-a-informacao\/participacao-social\/audiencias-e-consultas-publicas\/audiencias-publicas-em-andamento\">ANTAQ&#8217;s Social Participation System<\/a>.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">MPor defines the boundaries of the organized port area<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On April 27, 2026, <a href=\"https:\/\/nam10.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.in.gov.br%2Fweb%2Fdou%2F-%2Fportaria-gm-mpor-n-16-de-2-de-abril-de-2026-701476438&amp;data=05%7C02%7Cgustavo.almeida%40lefosse.com%7C25c2bc66d38b4bf0f2a808dead38cc31%7C8327b217ef5441a599c8c8fdfaeb06cb%7C0%7C0%7C639138656632060222%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&amp;sdata=jjHXLXXqsbxaBdBoSehoNsSFulNGzrEygvMQI%2BhyyVc%3D&amp;reserved=0\">GM-MPOR Ordinance No. 16\/2026<\/a>, issued by the Ministry of Ports and Airports (&#8220;<strong>MPor<\/strong>&#8220;), was published, defining the area of the Organized Port of Cabedelo, located in the Municipality of Cabedelo, State of Para\u00edba<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The ordinance provides that the organized port area is defined by polygons whose vertices have georeferenced coordinates listed in the annexes to the act. The rule also requires the port authority of the Organized Port of Cabedelo to make available to the public, on its website, a map of the polygons indicated in the ordinance, with precise identification of the boundaries of the port areas and their surroundings.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">IMO announces developments from the 84th session of the Marine Environment Protection Committee (MEPC 84)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">From April 27 to May 1, 2026, the International Maritime Organization \u2013 IMO, held in London, the 84th session of the Marine Environment Protection Committee (\u201c<strong>MEPC 84<\/strong>\u201d), with discussions on the reduction of greenhouse gas emissions, air pollution, ballast water management, energy efficiency of ships and prevention of marine pollution.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In the context of maritime decarbonization, the Committee continued discussions on the IMO Net-Zero Framework, without reaching consensus on the adoption of the regulatory framework. Discussions are expected to continue in two intersessional groups before MEPC 85, scheduled to take place from November 30 to December 3, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Among the main outcomes of MEPC 84, the following stand out: (i) the adoption of amendments to Annex VI of the International Convention for the Prevention of Pollution from Ships \u2013 MARPOL to designate the Northeast Atlantic as an Emission Control Area for nitrogen oxides, sulphur oxides and particulate matter; (ii) the approval of a package of amendments to the International Convention for the Control and Management of Ships\u2019 Ballast Water and Sediments; and (iii) the update of EEDI guidelines applicable to dual-fuel ships.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">ANTAQ considers delegation to SRG to decide on intragroup corporate transfers<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On April 29, 2026, ANTAQ included on the agenda of its <a href=\"https:\/\/www.gov.br\/antaq\/pt-br\/acesso-a-informacao\/institucional\/reunioes-deliberativas\/PautaROD608v5.pdf\">608th Virtual Ordinary Meeting<\/a> a proceeding concerning the issuance of an ordinance delegating authority to the Superintendence of Regulation (&#8220;SRG&#8221;), ANTAQ Case File No. 50300.008332\/2026-73.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The proposal concerns delegation to SRG of authority to decide requests for transfer of title or corporate control carried out within the same economic group, when exempt from competitive review under ANTAQ Resolution No. 57\/2021, with no admission of a new equity holder.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Office of the Chief of Staff recommends adjustments to the Tecon Santos 10 auction model<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On May 6, 2026, the Special Secretariat for the Investment Partnerships Program of the Office of the Chief of Staff of the Presidency sent to MPor <a href=\"https:\/\/static.poder360.com.br\/2026\/05\/pedido-casa-civil-leilao.pdf\">Official Letter No. 236\/2026\/SEPPI\/CC\/PR<\/a>, accompanied by T<a href=\"https:\/\/static.poder360.com.br\/2026\/05\/Nota-Tecon-10.pdf\">echnical Note No. 11\/2026\/SIEC\/SEPPI\/CC\/PR<\/a> (&#8220;Technical Note&#8221;), with recommendations for the modeling of the lease of Tecon Santos 10, in the Port of Santos\/SP.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Technical Note addresses, among other matters, the participation of incumbent operators subject to a commitment to divest container port assets in the Port of Santos, the absence of a prior prohibition on shipowners or vertically integrated groups, the grant payment structure, and obligations relating to land access and railway infrastructure.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">MPor establishes Working Group on rules for port, airport and waterway concessions<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On May 8, 2026, MPor established a <a href=\"https:\/\/www.gov.br\/portos-e-aeroportos\/pt-br\/assuntos\/noticias\/2026\/05\/mpor-cria-gt-para-uniformizar-regras-de-concessoes-de-portos-aeroportos-e-hidrovias\">Working Group<\/a> to assess the harmonization of the rules applicable to port, airport and waterway concessions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The working group will be coordinated by the Special Advisory Office to the Minister&#8217;s Office and will include representatives of the Executive Secretariat, ANAC and ANTAQ. The final report is to present studies and proposed guidelines for public policies and regulatory improvements within 90 days.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Federal Decree qualifies six terminals under the PPI<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On May 13, 2026, <a href=\"https:\/\/www.in.gov.br\/en\/web\/dou\/-\/decreto-n-12.970-de-12-de-maio-de-2026-705066345\">Federal Decree No. 12,970\/2026<\/a> was published, qualifying six federal public port-sector projects under the Investment Partnerships Program of the Presidency of the Republic (&#8220;PPI&#8221;).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The following terminals were qualified: IQI15, at the Organized Port of Itaqui\/MA, intended for the handling and storage of solid agricultural bulk cargoes; SUA01, at the Organized Port of Suape\/PE, intended for the handling and storage of Ro-Ro cargo and vehicles in general; IMB11 and IMB06, both at the Organized Port of Imbituba\/SC, intended, respectively, for the handling and storage of solid agricultural bulk cargoes and solid mineral bulk cargoes; RIG40, at the Organized Port of Rio Grande\/RS, intended for the handling and storage of liquid bulk cargoes; and MUC05, at the Organized Port of Fortaleza\/CE, intended for the handling and storage of solid mineral bulk cargoes.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Review of ANTAQ\u2019s 2025\u20132028 Regulatory Agenda<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">On May 14, 2026, ANTAQ announced the extension, until May 22, 2026, of the deadline for submitting suggestions to the ordinary review of its 2025\u20132028 Regulatory Agenda. The initiative seeks to broaden the participation of stakeholders from the waterway and port sectors, as well as other interested parties, in improving the Agency\u2019s regulatory planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">ANTAQ\u2019s 2025\u20132028 Regulatory Agenda sets out priority topics related to inland navigation, maritime navigation and port facilities, including matters that may impact port operations, enforcement, authorizations and other activities regulated by ANTAQ. The contributions received may support the inclusion, exclusion, adjustment or reprioritization of regulatory topics. For further information, please access <a href=\"https:\/\/forms.office.com\/Pages\/ResponsePage.aspx?id=J_dXjl4OMEGOJC1ffIw49s1-VexLWyZFkr-a3Sgj0F9UQTZFTVhMUVFWN0o1N0JSMkY4TEZDT0QxUC4u\">here<\/a> the form made available by ANTAQ to receive suggestions on regulatory topics.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><strong><mark style=\"background-color:rgba(0, 0, 0, 0);color:#6100b9\" class=\"has-inline-color\">Public Consultations and Hearings<\/mark><\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">ANTAQ<br>___<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><a href=\"https:\/\/www.gov.br\/antaq\/pt-br\/acesso-a-informacao\/participacao-social\/audiencias-e-consultas-publicas\/audiencias-publicas-em-andamento\">Public Hearing Notice No. 4\/2026<\/a><\/strong><br><strong>Purpose: <\/strong>to receive contributions on the technical and legal documents relating to the bidding procedure for the lease of area VDC04, located in the Organized Port of Vila do Conde\/PA.<br><strong>Date:<\/strong> June 8, 2026, through ANTAQ&#8217;s Social Participation System.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.gov.br\/antaq\/pt-br\/acesso-a-informacao\/participacao-social\/audiencias-e-consultas-publicas\/audiencias-publicas-em-andamento\"><strong>Public Hearing No. 2\/2026<\/strong><\/a><br><strong>Purpose: <\/strong>to receive contributions on the technical and legal documents relating to the concession of the Waterway Access Channel of the Organized Port of Santos\/SP.<br><strong>Period: <\/strong>until July 1, 2026, through ANTAQ&#8217;s Social Participation System.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">APS<br>___<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.portodesantos.com.br\/consulta-publica-referente-a-area-denominada-ssz-33e\/\"><strong>APS Public Consultation No. 1\/2026<\/strong><\/a><br><strong>Purpose:<\/strong> to receive contributions on the technical and legal documents relating to the bidding procedure for the lease of area SSZ 33E, intended for the storage of general cargo, project cargo and containerized cargo at the Santos\/SP Port Complex.<br><strong>Date: <\/strong>until June 1, 2026.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\"><mark style=\"background-color:rgba(0, 0, 0, 0);color:#6100b9\" class=\"has-inline-color\">Petrobras\u2019 Tender Opportunities<\/mark><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">We list below some of the main tender opportunities currently open by Petr\u00f3leo Brasileiro S.A.:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">(i) <strong>Opportunity No. 7004601531. <\/strong>Chartering of at least one (1) Fast Supply Crewboat (\u201cFSC\u201d) for the lots below:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Priority<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Type<\/strong><\/td><td class=\"has-text-align-center\" data-align=\"center\"><strong>Flag<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">1<\/td><td class=\"has-text-align-center\" data-align=\"center\">Lote A \u2013 FSC 25<\/td><td class=\"has-text-align-center\" data-align=\"center\">Brazilian<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">2<\/td><td class=\"has-text-align-center\" data-align=\"center\">Lote B \u2013 FSC 10<\/td><td class=\"has-text-align-center\" data-align=\"center\">Brazilian<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Start date for proposals\u2019 submission: <\/strong>May 18, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Deadline for proposals\u2019 submission: <\/strong>June 9, 2026. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>(ii) Opportunity No. 7004597133. <\/strong>Subsea Engineering, Procurement, Construction and Installation \u2013 EPCI, on a lump-sum basis, covering engineering services, installation of a subsea system and supply of goods for the implementation of the Rota SEAP Pipeline and SEAP II EPCI, divided into the three (3) lots below:<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td class=\"has-text-align-center\" data-align=\"center\"><strong>Lot<\/strong><\/td><td class=\"has-text-align-left\" data-align=\"left\"><strong>Object<\/strong><\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">A<\/td><td class=\"has-text-align-left\" data-align=\"left\">(i) Supply of goods, including pipes, accessories and equipment for rigid export pipelines, field joints, rigid jumpers, Pipeline End Terminations \u2013 PLETs, Pipeline End Manifold \u2013 PLEM, valve skid, Emergency Shutdown Valve \u2013 ESDV, Umbilical Terminal Assembly \u2013 UTA, and anchoring materials for PLETs, PLEM and risers; and<br>(ii) Provision of engineering design services and subsea installation and tie-in services.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">B<\/td><td class=\"has-text-align-left\" data-align=\"left\">(i) Supply of goods, including pipes, accessories and equipment for rigid gas production pipelines, field joints, rigid jumpers, Pipeline End Terminations \u2013 PLETs, Emergency Shutdown Valves \u2013 ESDVs, Umbilical Terminal Assemblies \u2013 UTAs, and anchoring materials for PLETs and risers; and<br>(ii) Provision of engineering design services and subsea installation and tie-in services for the production gathering system, in accordance with the specifications of this document and its annexes.<\/td><\/tr><tr><td class=\"has-text-align-center\" data-align=\"center\">C<br>(integrator)<\/td><td class=\"has-text-align-left\" data-align=\"left\">(i) Supply of goods, including pipes, accessories and equipment for rigid gas export and production pipelines, field joints, rigid jumpers, Pipeline End Terminations \u2013 PLETs, Pipeline End Manifold \u2013 PLEM, valve skid, Emergency Shutdown Valves \u2013 ESDVs, Umbilical Terminal Assemblies \u2013 UTAs, and anchoring materials for PLETs, PLEM and risers; and<br>(ii) Provision of engineering design services and subsea installation and tie-in services for the gas export system and production gathering system.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Start date for proposals\u2019 submission: <\/strong>May 14, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Deadline for proposals\u2019 submission: <\/strong>August 14, 2026, according to the latest extension.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>(iii) Opportunity No. 7004497861. <\/strong>Chartering of one (1) Brazilian-flagged Oil Spill Recovery Vessel 105 \u2013 OSRV.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Start date for proposals\u2019 submission: <\/strong>May 7, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Deadline for proposals\u2019 submission:<\/strong> May 28, 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We note that the opportunities referred to in items (i) and (iii) are restricted to suppliers pre-qualified under Pre-Qualification No. 7002924107, pursuant to the Bidding Notice published in the B<a href=\"https:\/\/www.in.gov.br\/web\/dou\/-\/aviso-de-licitacao-09-687155191\">razilian Official Gazette on February 13, 2026<\/a>.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<p class=\"has-background wp-block-paragraph\" style=\"background-color:#ededed\">Please note that this material is for informational purposes only. Our team closely monitors trends and developments in the <a href=\"https:\/\/lefosse.com\/en\/practice\/maritime-and-port\/\">Shipping<\/a> sector and is available to provide further information on these or any other topics.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This edition covers April and May. Featured News ANTAQ extends deadline for Public Hearing No. 2\/2026 on the Port of Santos access channel On April 22, 2026, the National Waterway Transportation Agency (&#8220;ANTAQ&#8220;) published DG Deliberation No. 21\/2026, which extended the deadline for submission of contributions to Public Hearing No. 2\/2026, concerning the technical and [&hellip;]<\/p>\n","protected":false},"author":43,"featured_media":32403,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[835],"tags":[],"class_list":["post-32402","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-newsletter"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Newsletter | Shipping - May, 2026 - Lefosse<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Newsletter | Shipping - May, 2026 - Lefosse\" \/>\n<meta property=\"og:description\" content=\"This edition covers April and May. Featured News ANTAQ extends deadline for Public Hearing No. 2\/2026 on the Port of Santos access channel On April 22, 2026, the National Waterway Transportation Agency (&#8220;ANTAQ&#8220;) published DG Deliberation No. 21\/2026, which extended the deadline for submission of contributions to Public Hearing No. 2\/2026, concerning the technical and [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/\" \/>\n<meta property=\"og:site_name\" content=\"Lefosse\" \/>\n<meta property=\"article:published_time\" content=\"2026-06-01T15:01:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-01T15:01:39+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/lefosse.com\/wp-content\/uploads\/2026\/06\/Picture2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Flavio Carneiro | Lefosse\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Flavio Carneiro | Lefosse\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/\"},\"author\":{\"name\":\"Flavio Carneiro | Lefosse\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/#\\\/schema\\\/person\\\/80efcbe3646fec82752c23f862c77a11\"},\"headline\":\"Newsletter | Shipping &#8211; May, 2026\",\"datePublished\":\"2026-06-01T15:01:08+00:00\",\"dateModified\":\"2026-06-01T15:01:39+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/\"},\"wordCount\":1525,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Picture2.jpg\",\"articleSection\":[\"Newsletter\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/\",\"url\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/\",\"name\":\"Newsletter | Shipping - May, 2026 - Lefosse\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#primaryimage\"},\"thumbnailUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Picture2.jpg\",\"datePublished\":\"2026-06-01T15:01:08+00:00\",\"dateModified\":\"2026-06-01T15:01:39+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/#\\\/schema\\\/person\\\/80efcbe3646fec82752c23f862c77a11\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#primaryimage\",\"url\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Picture2.jpg\",\"contentUrl\":\"\\\/wp-content\\\/uploads\\\/2026\\\/06\\\/Picture2.jpg\",\"width\":2000,\"height\":1125},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/newsletter\\\/newsletter-shipping-may-2026\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/lefosse.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Newsletter | Shipping &#8211; May, 2026\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/lefosse.com\\\/en\\\/\",\"name\":\"Lefosse\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/lefosse.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/lefosse.com\\\/en\\\/#\\\/schema\\\/person\\\/80efcbe3646fec82752c23f862c77a11\",\"name\":\"Flavio Carneiro | Lefosse\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g\",\"caption\":\"Flavio Carneiro | Lefosse\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Newsletter | Shipping - May, 2026 - Lefosse","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/","og_locale":"en_US","og_type":"article","og_title":"Newsletter | Shipping - May, 2026 - Lefosse","og_description":"This edition covers April and May. Featured News ANTAQ extends deadline for Public Hearing No. 2\/2026 on the Port of Santos access channel On April 22, 2026, the National Waterway Transportation Agency (&#8220;ANTAQ&#8220;) published DG Deliberation No. 21\/2026, which extended the deadline for submission of contributions to Public Hearing No. 2\/2026, concerning the technical and [&hellip;]","og_url":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/","og_site_name":"Lefosse","article_published_time":"2026-06-01T15:01:08+00:00","article_modified_time":"2026-06-01T15:01:39+00:00","og_image":[{"width":2000,"height":1125,"url":"https:\/\/lefosse.com\/wp-content\/uploads\/2026\/06\/Picture2.jpg","type":"image\/jpeg"}],"author":"Flavio Carneiro | Lefosse","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Flavio Carneiro | Lefosse","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#article","isPartOf":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/"},"author":{"name":"Flavio Carneiro | Lefosse","@id":"https:\/\/lefosse.com\/en\/#\/schema\/person\/80efcbe3646fec82752c23f862c77a11"},"headline":"Newsletter | Shipping &#8211; May, 2026","datePublished":"2026-06-01T15:01:08+00:00","dateModified":"2026-06-01T15:01:39+00:00","mainEntityOfPage":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/"},"wordCount":1525,"commentCount":0,"image":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2026\/06\/Picture2.jpg","articleSection":["Newsletter"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/","url":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/","name":"Newsletter | Shipping - May, 2026 - Lefosse","isPartOf":{"@id":"https:\/\/lefosse.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#primaryimage"},"image":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#primaryimage"},"thumbnailUrl":"\/wp-content\/uploads\/2026\/06\/Picture2.jpg","datePublished":"2026-06-01T15:01:08+00:00","dateModified":"2026-06-01T15:01:39+00:00","author":{"@id":"https:\/\/lefosse.com\/en\/#\/schema\/person\/80efcbe3646fec82752c23f862c77a11"},"breadcrumb":{"@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#primaryimage","url":"\/wp-content\/uploads\/2026\/06\/Picture2.jpg","contentUrl":"\/wp-content\/uploads\/2026\/06\/Picture2.jpg","width":2000,"height":1125},{"@type":"BreadcrumbList","@id":"https:\/\/lefosse.com\/en\/newsletter\/newsletter-shipping-may-2026\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/lefosse.com\/en\/"},{"@type":"ListItem","position":2,"name":"Newsletter | Shipping &#8211; May, 2026"}]},{"@type":"WebSite","@id":"https:\/\/lefosse.com\/en\/#website","url":"https:\/\/lefosse.com\/en\/","name":"Lefosse","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/lefosse.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/lefosse.com\/en\/#\/schema\/person\/80efcbe3646fec82752c23f862c77a11","name":"Flavio Carneiro | Lefosse","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/89dfebbc8a734ce05438d0233b8a07b3028c5a863e5c89ea92cce862fd39dee2?s=96&d=mm&r=g","caption":"Flavio Carneiro | Lefosse"}}]}},"_links":{"self":[{"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/posts\/32402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/users\/43"}],"replies":[{"embeddable":true,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/comments?post=32402"}],"version-history":[{"count":2,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/posts\/32402\/revisions"}],"predecessor-version":[{"id":32405,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/posts\/32402\/revisions\/32405"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/media\/32403"}],"wp:attachment":[{"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/media?parent=32402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/categories?post=32402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lefosse.com\/en\/wp-json\/wp\/v2\/tags?post=32402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}